Find out all the latest news from the project, and events involving the community. We will post news items here regularly, keeping you up to date with everything that’s happening around the project site. Keep an eye out for progress photos, and activities at the site that will involve residents and local schools.
  
GREAT EASTERN QUAYS
Latest News


Progress on Site & Health Screening Day
With the New Year now upon us, we would like to bring you up to date with news from Site.

Progress

Another month has flown by and the work pace is picking up very fast to match. We have now completed 99% of the RC frames on site and are ahead of programme. Our first block should hand over at the beginning of May 2016.

The road infrastructure has now commenced around the first block that is to be handed over. Internally we are nearing completion of the show flats; these are anticipated to be completed by the end of January 2016

Our energy centre that will feed not only our development but also future phases of work is also nearing completion. We have commenced the district heating throughout the site ahead of installing the roads.

We now have a daily sweeper operating in the local roads in an effort to keep the areas as clean and tidy as possible for our neighbouring residents. The brickwork to the first block is nearing completion and we have started to do some of the feature panels which are an attractive green glazed brick; some are in a saw tooth design and some are a normal laid green glazed brick. There will also be some brown glazed brick with fluted GRC panels above and a GRC cill that will commence in January 2016.

In January 2016 we will be starting to install the paving to the front end of site working our way backwards into the site.

The above aerial photograph was taken in November 2015. For more aerial photographs please see the Homepage 'Downloads' link entitled ‘Great Eastern Quays Aerial Photographs 11-11-15

Health Screening Day

At the end of November 2015, a nurse visited site to undertake a health screening check, i.e Blood Pressure, etc. This was offered to all on site and it was well received. Please see photograph on the Homepage 'Downloads' link entitled ‘Health Screening Day Photograph November 2015’.





View Most Recent...
Great Eastern Quays Phase 1 Claims Two Awards in one Week!   (posted: 18/05/2018)
Latest Aerial Photographs   (posted: 03/05/2018)
Progress on Site, Aerial Photographs January 2018 & Great Eastern Quays Phase 1 Wins What House Awards   (posted: 06/03/2018)
Latest Aerial Photographs & Considerate Constructors Scheme Performance Beyond Compliance Certificate   (posted: 17/11/2017)
Phase 2 Commencement of Works   (posted: 19/07/2017)
Completion of Great Eastern Quays Phase 1   (posted: 22/06/2017)